🚢 Marine & Industrial
Oversized winch assemblies and deck machinery would not fit in containers, and multiple carriers were declining the bookings. We designed a breakbulk and RO-RO program with pre-approved stowage.
Results at a glance
Equipment Damage Claims
Equipment damage claims per quarter
Sailing Misses
Missed sailings per quarter
Commissioning Lead Time
Commissioning lead time per shipment
The Challenge
The manufacturer was moving winch assemblies and deck cranes that simply cannot be containerized. Carriers had already refused the bookings outright. A previous forwarder damaged equipment and trailer decks while working one of these moves through a port. Factory installation schedules were tied to roll-on/roll-off sailings that were repeatedly cancelled, and every missed sailing pushed commissioning further out.
The Approach
We engineered a breakbulk solution using flat-rack stowage for the winch assemblies and a dedicated RO-RO charter for the deck machinery. Stowage and lashing plans were pre-approved with the carrier so nothing was improvised at origin. A heavy-haul drayage partner and pre-cleared customs entries removed the port surprises that had cost the client before. We built a sailing schedule with fixed departure windows each quarter.
Execution
Surveying equipment dimensions, weights, and center-of-gravity points for every piece in the project pipeline.
Matching each item to flat-rack, breakbulk, or RO-RO and getting stowage plans accepted by the carrier in advance.
Supervised loading at origin, escorted discharge at destination, and heavy-haul drayage direct to the yard.
Advance planning against the sailing calendar, so heavy-lift slots are reserved before the installation date is fixed.